In modern flooring projects, the ride-on concrete laser screed serves as the pivotal piece of equipment for ensuring the flatness of large-area floor surfaces. To assist you in quickly commencing operations and achieving international FF/FL standards, we have prepared this comprehensive summary of the video operation manual.
Upon receiving the machine, the first step is to correctly assemble the leveling head onto the main body:
Physical Connection:Remove the R-pin, align the mounting holes on the hydraulic cylinder, insert a washer, and then tap the pin into place to secure the connection.
Hydraulic System (Critical Step): When connecting the hydraulic hoses, ensure that the collar on the female coupler is pulled back. If the pressure within the fitting is too high to allow insertion, use a wrench to gently loosen the screw to "bleed" the pressure; the connection can then be made with ease.
Electrical Connections:Both the vibration motor and the tilt sensor cables feature a keyed design with corresponding grooves and protrusions; ensure that the alignment keys are correctly matched before tightening the waterproof screws.

Control Panel Overview:
Proficient operation of the controls on a ride-on concrete laser screed is a prerequisite for efficient construction:
Elevation Control: The left and right hydraulic cylinders operate independently to control lifting and lowering, working in conjunction with the tilt adjustment function (raising or lowering the screed head).
Auger Distribution: Supports forward and reverse rotation switching, enabling material discharge to the right or assisting in material spreading.
Automation Core:The "Manual/Auto" toggle switch activates the laser leveling system, while the "Rough Screed" button raises the screed head 2 cm above the target elevation to facilitate preliminary material spreading.
Power Management:The main red power switch-working in tandem with the choke and electronic throttle-ensures stable engine ignition and reliable performance during high-speed operations.

Laser System Calibration:
This is a critical step in achieving high-precision concrete flooring:
Transmitter Setup: Set up the tripod and ensure the bubble level is centered; it is highly recommended to set the height between 1.8m and 1.9m.
Benchmark Elevation Acquisition: Using a handheld rod equipped with a digital receiver, adjust the device to the "0" position while resting it on a standard aluminum block (or designated reference point).
Machine Receiver Alignment:
Adjust the receiver mounted on the machine until it indicates a "Green Light" status (a red light indicates the elevation is too high, while a yellow light indicates it is too low).

Auto-Leveling Test: Activate the automatic mode and observe whether the hydraulic cylinders automatically adjust the screed head to return it to the "Green Light" status.
Verification: Prior to commencing construction, use the handheld rod to measure both ends of the vibrating screed plate once more to ensure the digital reading remains at "0".
Conclusion:
With proper installation and elevation calibration, your high-precision concrete flooring machine will demonstrate exceptional operational performance. For a more visual guide to the steps, please watch our video on the high-precision concrete flooring machine.
Thank you for your support and trust in Hangzhou Mtecix Machinery Technology Co., Ltd.
If you want to know more about Hangzhou Mtecix Machinery Technology Co., Ltd. or have any questions, please feel free to contact us:
• Tel: +86-19026181533
• Email: hwaon13964985207@gmail.com
• Website: https://www.maixtec.com/contact-us